# Risk register workspace

- Link: https://blog.curbsoftware.com/changelog/riskcurb-v0-2-0-risk-register-workspace/
- Published: 2025-12-10T00:00:00+00:00
- Author: curbsoftware

The register is the heart of RiskCurb. This release introduces the structured workspace
teams build everything else on.

## Highlights

 * Capture enterprise, operational, project, and strategic risks
 * Owner, accountable department, and service-area tagging
 * Inherent and residual rating with next-review scheduling
 * Status history on every risk

A single, accountable home for risk, and the starting point for connecting controls,
claims, and reporting.
